Electrical SCADA — I/O summary & DBR
The electrical half of the same engine: HT and LT breakers, transformers, DG sets, UPS and multi-function meters become the SCADA point summary with the command philosophy (what SCADA may operate), sequence-of-events recording and the Electrical SCADA Design Basis Report.
You enter
- Substations, panels, breakers, transformers, DG, meters
- Command philosophy, protocols
You get
- SCADA I/O Summary Excel
- Electrical SCADA DBR
- Report
What it does
Checks it performs
Sample report
Inputs, results with basis, checks, worked example, drawing and the standards list. Read it before you pay.
How to use it
- Set the scope (BMS, electrical SCADA or both), the template profile (Detailed or Generic), the spare % and the code regime.
- Build the equipment schedule: one row per asset type with quantity, building, floor and zone — or import the Excel schedule.
- Read the live I/O summary, the field-device schedule and the points requiring confirmation; adjust quantities or templates.
- Fill the DBR front matter (project, client, consultant, contractor, revision) and export the I/O Summary (Excel), the Design Basis Report (Word) and the report.
- Panels & architecture tab: choose the panel allocation (building → floor → zone, per system or fill), points per controller, controllers per panel, module sizes, panels per MS/TP trunk and trunks per NLC; floor ranges like G–3 spread the units. Read the system architecture, the floor-wise panel SLD sheets and each panel's I/O card layout, then export the Architecture & SLD (DXF) and Panels & cables (Excel: allocation, BOM, every channel, cable schedule with lengths).
What you enter
- Equipment schedule — asset type, tag, qty, building / floor / zone, note
- Policies — scope, profile, spare %, regime, protocols, controller sizing
- DBR data — titles, parties, revision, background, references
What you get
- I/O Summary (Excel) — R1 layout: sub-rows per point, Monitor / Control / Alarm, remarks, field-device columns, spare, notes
- Design Basis Report (Word) — 17 sections with every table filled from the schedule
- Report — HTML summary with the shared stylesheet
Also searched as
electrical SCADA I/O list; SCADA point summary for substation; SCADA design basis report; IEC 61850 SCADA points; breaker status and control points list; power SCADA design. The same calculation, the same clauses — one tool for automation / elv design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).
Standards applied
| Reference | Title | Used for |
|---|---|---|
| ISO 16484 (Parts 1–6) | Building automation and control systems | System design, hardware, functions, data communication (BACnet) for the BMS |
| ASHRAE Standard 135 / ISO 16484-5 (BACnet) | Data communication protocol for building automation and control networks | Backbone and controller network protocol |
| ASHRAE Guideline 36 | High-performance sequences of operation for HVAC systems | Control narratives for AHUs, plants and zones |
| ASHRAE Guideline 13 | Specifying building automation systems | Point classification, spare capacity, graphics and alarm philosophy |
| Modbus Application Protocol V1.1b3 / Serial Line V1.02 | Modbus protocol specifications | Third-party integration of drives, meters, chillers, UPS and plant PLCs |
| IEC 61131-2 / -3 | Programmable controllers — equipment requirements and programming languages | PLC panels for tunnel / car-park ventilation, lighting and electrical SCADA |
| IEC 61439-1/2:2020 / IS/IEC 61439 | Low-voltage switchgear and controlgear assemblies | Panel construction (TTA/PTTA), busbar short-time withstand (Icw 1 s), temperature rise, IP rating |
| IEC 62443 (series) | Security for industrial automation and control systems | Zones and conduits, user management, hardening of the automation network |
| IEC 61850 | Communication networks and systems for power utility automation | Substation SCADA — relays, IEDs, GOOSE / MMS |
| IEC 60870-5-104 | Telecontrol equipment and systems — network access | Electrical SCADA telecontrol over TCP/IP |
| NBCS 2026 (SP 7:2026) Part D Sec 2 | National Building Construction Standards — Electrical and allied installations | Load assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads |
| NBCS 2026 (SP 7:2026) Part D Sec 3 | National Building Construction Standards — Air conditioning, heating and mechanical ventilation | Design conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation |
| NBCS 2026 (SP 7:2026) Part D Sec 5 | National Building Construction Standards — Lifts, escalators, moving walks and power-driven parking | Lift traffic, fire-fighting lifts, controls |
| NBCS 2026 (SP 7:2026) Part D Sec 6 | National Building Construction Standards — Information and communication enabled installations | Structured cabling, Wi-Fi (IEEE 802.11ax/be), ICT spaces |
| NBCS 2026 (SP 7:2026) Part F | National Building Construction Standards — Fire and life safety | Means of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9) |
| CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 | Central Electricity Authority safety regulations | Statutory safety requirements for installations |
| IS 732:2019 | Code of practice for electrical wiring installations | Voltage-drop limits, cable selection, protection coordination (adopts IEC 60364) |
| IS 3043:2018 | Code of practice for earthing | Earth bus, strip sizing, earthing of panels (future earthing tool) |
| CPWD General Specifications for Electrical Works Part VI (BMS) | Building management system specification | Panels, cabling, controllers and head end for CPWD works |
Frequently asked
How do I use the Electrical SCADA — I/O summary & DBR calculator?
Set the scope (BMS, electrical SCADA or both), the template profile (Detailed or Generic), the spare % and the code regime. Build the equipment schedule: one row per asset type with quantity, building, floor and zone — or import the Excel schedule. Read the live I/O summary, the field-device schedule and the points requiring confirmation; adjust quantities or templates.
Which codes and standards does the electrical scada follow?
It applies ISO 16484 (Parts 1–6), ASHRAE Standard 135 / ISO 16484-5 (BACnet), ASHRAE Guideline 36, ASHRAE Guideline 13, Modbus Application Protocol V1.1b3 / Serial Line V1.02, IEC 61131-2 / -3 and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.
What does it check?
Every run is marked PASS or CHECK against: Remote breaker operation only with the local selector in remote; Every trip a critical alarm with SOE record; PLC I/O with 15 % spare; Meter count reconciled with the LT panel SLDs; Dual path for transformer protection signals.
Is the calculator free to use?
Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.
Can I see a sample report before I use it?
Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/scada/ — inputs, results with basis, checks, worked example, drawing and the standards list.
Is this the same as a electrical SCADA I/O list?
Yes. People also call it a SCADA point summary for substation, a SCADA design basis report, a IEC 61850 SCADA points. It covers the same calculation under automation / elv design, with the Indian and international code regimes selectable.
Does it work with AutoCAD or ZWCAD?
Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.