All calculators
Automation / ELV · Live

Electrical SCADA — I/O summary & DBR

The electrical half of the same engine: HT and LT breakers, transformers, DG sets, UPS and multi-function meters become the SCADA point summary with the command philosophy (what SCADA may operate), sequence-of-events recording and the Electrical SCADA Design Basis Report.

ISO 16484 (Parts 1–6)ASHRAE Standard 135 / ISO 16484-5 (BACnet)ASHRAE Guideline 36ASHRAE Guideline 13Modbus Application Protocol V1.1b3 / Serial Line V1.02IEC 61131-2 / -3
What goes in, what comes out

You enter

  • Substations, panels, breakers, transformers, DG, meters
  • Command philosophy, protocols

You get

  • SCADA I/O Summary Excel
  • Electrical SCADA DBR
  • Report

What it does

Switchgear pointsBreaker status, trip, local / remote, commands where permitted; relay and MFM data over IEC 61850 / Modbus.
Transformers and DGWTI / OTI alarms and values, Buchholz, DG controller parameters.
Energy accountingMeter register sets per feeder, tariff-period reports.
I/O SummarySame submission layout as the BMS sheet.
DBRArchitecture, PLC panel arrangement, command philosophy, SOE, alarm classes.
BMS interfaceRead-only subset shared with the BMS.

Checks it performs

PASS / CHECKRemote breaker operation only with the local selector in remote
PASS / CHECKEvery trip a critical alarm with SOE record
PASS / CHECKPLC I/O with 15 % spare
PASS / CHECKMeter count reconciled with the LT panel SLDs
PASS / CHECKDual path for transformer protection signals

Sample report

How to use it

  1. Set the scope (BMS, electrical SCADA or both), the template profile (Detailed or Generic), the spare % and the code regime.
  2. Build the equipment schedule: one row per asset type with quantity, building, floor and zone — or import the Excel schedule.
  3. Read the live I/O summary, the field-device schedule and the points requiring confirmation; adjust quantities or templates.
  4. Fill the DBR front matter (project, client, consultant, contractor, revision) and export the I/O Summary (Excel), the Design Basis Report (Word) and the report.
  5. Panels & architecture tab: choose the panel allocation (building → floor → zone, per system or fill), points per controller, controllers per panel, module sizes, panels per MS/TP trunk and trunks per NLC; floor ranges like G–3 spread the units. Read the system architecture, the floor-wise panel SLD sheets and each panel's I/O card layout, then export the Architecture & SLD (DXF) and Panels & cables (Excel: allocation, BOM, every channel, cable schedule with lengths).

What you enter

  • Equipment schedule — asset type, tag, qty, building / floor / zone, note
  • Policies — scope, profile, spare %, regime, protocols, controller sizing
  • DBR data — titles, parties, revision, background, references

What you get

  • I/O Summary (Excel) — R1 layout: sub-rows per point, Monitor / Control / Alarm, remarks, field-device columns, spare, notes
  • Design Basis Report (Word) — 17 sections with every table filled from the schedule
  • Report — HTML summary with the shared stylesheet

Also searched as

electrical SCADA I/O list; SCADA point summary for substation; SCADA design basis report; IEC 61850 SCADA points; breaker status and control points list; power SCADA design. The same calculation, the same clauses — one tool for automation / elv design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
ISO 16484 (Parts 1–6)Building automation and control systemsSystem design, hardware, functions, data communication (BACnet) for the BMS
ASHRAE Standard 135 / ISO 16484-5 (BACnet)Data communication protocol for building automation and control networksBackbone and controller network protocol
ASHRAE Guideline 36High-performance sequences of operation for HVAC systemsControl narratives for AHUs, plants and zones
ASHRAE Guideline 13Specifying building automation systemsPoint classification, spare capacity, graphics and alarm philosophy
Modbus Application Protocol V1.1b3 / Serial Line V1.02Modbus protocol specificationsThird-party integration of drives, meters, chillers, UPS and plant PLCs
IEC 61131-2 / -3Programmable controllers — equipment requirements and programming languagesPLC panels for tunnel / car-park ventilation, lighting and electrical SCADA
IEC 61439-1/2:2020 / IS/IEC 61439Low-voltage switchgear and controlgear assembliesPanel construction (TTA/PTTA), busbar short-time withstand (Icw 1 s), temperature rise, IP rating
IEC 62443 (series)Security for industrial automation and control systemsZones and conduits, user management, hardening of the automation network
IEC 61850Communication networks and systems for power utility automationSubstation SCADA — relays, IEDs, GOOSE / MMS
IEC 60870-5-104Telecontrol equipment and systems — network accessElectrical SCADA telecontrol over TCP/IP
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
NBCS 2026 (SP 7:2026) Part D Sec 3National Building Construction Standards — Air conditioning, heating and mechanical ventilationDesign conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation
NBCS 2026 (SP 7:2026) Part D Sec 5National Building Construction Standards — Lifts, escalators, moving walks and power-driven parkingLift traffic, fire-fighting lifts, controls
NBCS 2026 (SP 7:2026) Part D Sec 6National Building Construction Standards — Information and communication enabled installationsStructured cabling, Wi-Fi (IEEE 802.11ax/be), ICT spaces
NBCS 2026 (SP 7:2026) Part FNational Building Construction Standards — Fire and life safetyMeans of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
CEA (Measures relating to Safety and Electric Supply) Regulations, 2023Central Electricity Authority safety regulationsStatutory safety requirements for installations
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IS 3043:2018Code of practice for earthingEarth bus, strip sizing, earthing of panels (future earthing tool)
CPWD General Specifications for Electrical Works Part VI (BMS)Building management system specificationPanels, cabling, controllers and head end for CPWD works

Frequently asked

How do I use the Electrical SCADA — I/O summary & DBR calculator?

Set the scope (BMS, electrical SCADA or both), the template profile (Detailed or Generic), the spare % and the code regime. Build the equipment schedule: one row per asset type with quantity, building, floor and zone — or import the Excel schedule. Read the live I/O summary, the field-device schedule and the points requiring confirmation; adjust quantities or templates.

Which codes and standards does the electrical scada follow?

It applies ISO 16484 (Parts 1–6), ASHRAE Standard 135 / ISO 16484-5 (BACnet), ASHRAE Guideline 36, ASHRAE Guideline 13, Modbus Application Protocol V1.1b3 / Serial Line V1.02, IEC 61131-2 / -3 and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

What does it check?

Every run is marked PASS or CHECK against: Remote breaker operation only with the local selector in remote; Every trip a critical alarm with SOE record; PLC I/O with 15 % spare; Meter count reconciled with the LT panel SLDs; Dual path for transformer protection signals.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/scada/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a electrical SCADA I/O list?

Yes. People also call it a SCADA point summary for substation, a SCADA design basis report, a IEC 61850 SCADA points. It covers the same calculation under automation / elv design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.

Related automation / elv calculators