Project hub — one building, every tool
The project view: the building model at the root, every tool built from it around it — created from the source in one click, opened in place, flagged the moment the source is saved after the tool last imported from it, and re-run down the chain (lux → layouts, load → power distribution, sprinkler layout → calc sheet) without losing the settings and positions you set in each tool. One roll-up BOQ across the tools.
What it does
Checks it performs
Sample report
Inputs, results with basis, checks, worked example, drawing and the standards list. Read it before you pay.
How to use it
- Create a hub with a new building model (or link an existing one); build the model — storeys, rooms — in the Building tool.
- Create each tool from its source: lighting, load estimation, sprinkler layout, LPS, drainage from the building; power distribution from the load estimate; electrical layouts from the lighting design (and cables from the PDD); the sprinkler calc sheet from the layout.
- Work in each tool as usual; when a source is saved again the tools built from it turn stale — re-run one, or every stale tool in dependency order.
- Read the roll-up BOQ across the tools and export it.
What you enter
- Building model — the root project
- Links — existing projects attached to any node
What you get
- Status — per tool: up to date / stale / not created, headline metrics
- Re-run — in place, keeping the tool's own settings where it can
- BOQ roll-up — luminaires, DBs, wire, conduit, tray, heads, pipes, fittings, earthing, drainage
Also searched as
MEP project hub; building model to calculations; one model every tool. The same calculation, the same clauses — one tool for building model design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).
Standards applied
| Reference | Title | Used for |
|---|---|---|
| NBCS 2026 (SP 7:2026) Part F | National Building Construction Standards — Fire and life safety | Means of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9) |
| NBCS 2026 (SP 7:2026) Part D Sec 2 | National Building Construction Standards — Electrical and allied installations | Load assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads |
| NBCS 2026 (SP 7:2026) Part E Sec 1 | National Building Construction Standards — Water supply | Per-capita demand, storage, fixture units and probable flow, pressures and zoning |
Frequently asked
How do I use the Project hub — one building, every tool calculator?
Create a hub with a new building model (or link an existing one); build the model — storeys, rooms — in the Building tool. Create each tool from its source: lighting, load estimation, sprinkler layout, LPS, drainage from the building; power distribution from the load estimate; electrical layouts from the lighting design (and cables from the PDD); the sprinkler calc sheet from the layout. Work in each tool as usual; when a source is saved again the tools built from it turn stale — re-run one, or every stale tool in dependency order.
Which codes and standards does the project hub follow?
It applies NBCS 2026 (SP 7:2026) Part F, NBCS 2026 (SP 7:2026) Part D Sec 2, NBCS 2026 (SP 7:2026) Part E Sec 1. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.
Is the calculator free to use?
Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.
Can I see a sample report before I use it?
Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/hub/ — inputs, results with basis, checks, worked example, drawing and the standards list.
Is this the same as a MEP project hub?
Yes. People also call it a building model to calculations, a one model every tool. It covers the same calculation under building model design, with the Indian and international code regimes selectable.
Does it work with AutoCAD or ZWCAD?
Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.