Technical specification maker

The firm's complete MEP specifications, the way they go out on a tender: Electrical works (HT panel, HT / LT cables, transformers, DG, bus duct, trays, earthing, LT panels, DBs, wiring, fixtures, external lighting, solar, UPS, EV charging), Fire fighting, Fire alarm & PA, HVAC (piping, pumps, AHUs, FCUs, TFAs, precision units, splits, VRF, ventilation, ducting, dampers, VAV, fans, air curtains, pressurisation, acoustics, controls, lifts), Internal and External plumbing, ITS & ELV, plus the special systems — around 330,000 words of house clauses in the house format (SECTION I…N, Scope of work, Codes and standards listed once, item clauses, Measurement, End of Section). Pick the profile, type the project, site conditions and building names once, tick the documents, edit any clause and keep it as the company's version; Word with Contents and page numbers, preview and the compliance sheet

CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation)CPWD General Specifications for Electrical Works Part I (Internal) 2023NBCS 2026 (SP 7:2026) Part D Sec 2IS 732:2019IEC 60364-1NFPA 13:2022

What it does

Checks it performs

Sample report

How to use it

  1. Choose the profile — Government / Private use the house clauses on the Indian codes; International replaces every Indian code with its IEC / ISO / NFPA / EN equivalent — and type the project, employer, consultant, site conditions (ambient, altitude, seismic zone, fire authority, electrical inspectorate) and the building names.
  2. Tick the documents or the sections you need: Electrical works (17 sections, HT panel to EV charging), Fire fighting, Fire alarm & PA, HVAC (22 sections incl. lifts), Internal and External plumbing, ITS & ELV, and the special systems; the sections are numbered SECTION I, II … with Scope of work, Codes and standards, the item clauses and Measurement, 'End of Section'.
  3. Read the document: every clause can be edited, removed or added; clauses that name the project buildings are marked project-specific — check their wording; codes are listed once per section under Codes and standards and in the schedule at the end. Keep edited clauses as your firm's house version (shared by the company).
  4. Approved makes per section, project values from the hub (cable sizes, DBs, luminaires, chillers …) for edited or added clauses, then Preview / Word (A4, Arial, running header, Contents, page numbers) and the clause-by-clause compliance sheet for the tender.

What you enter

  • Profile — Government / Private (Indian codes) · International
  • Project — name, location, state, employer, consultant, phase, document ref / revision / date
  • Green tier — ECSBC 2024 — ECSBC / ECSBC+ / Super ECSBC (with the water, waste, IEQ, controls & IoT, commissioning, materials and power-quality chapters), LEED v4.1, GRIHA 3 / 4 / 5 star with the climate zone — the figures (chiller COP, fan and pump power, VFDs, motor class, insulation, LPD, controls, transformer level, metering, fixture flows, recycled water, commissioning) go into every governed section and the schedule; override any on the Values tab
  • GTP — guaranteed technical particulars tables for transformer, DG, HT / LT panels, UPS, bus duct, chiller, cooling tower, pumps, AHU, VRF, fire pumps, lifts, STP, booster set — project figures from the hub, Offered column for the vendor
  • Site — ambient, altitude, seismic zone, fire authority, electrical inspectorate, building names
  • Sections — any of the ~75 house sections; options on the special systems
  • Edits — clause edits, removals, additional clauses, approved makes, value overrides

What you get

  • Specification — house-style document: SECTION I…N, numbered clauses, lettered lists, tables, End of Section
  • Word — .docx A4 with Contents and page numbers
  • Compliance sheet — clause-by-clause Excel for the tenderer
  • Schedule — codes and standards cited, once

Also searched as

technical specification generator; MEP technical specification template; electrical specification for tender; HVAC technical specification; plumbing specification document; fire fighting specification as per NBC. The same calculation, the same clauses — one tool for building model design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation)CPWD specificationsVoltage-drop cascade limits, cable/wiring practice, panel and metering requirements
CPWD General Specifications for Electrical Works Part I (Internal) 2023Internal electrical installationsSub-circuit limits (800 W / 10 points), 16 A socket circuits, wiring sizes, DB construction
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IEC 60364-1Low-voltage electrical installations — fundamental principles, assessment of general characteristicsMaximum demand and diversity
NFPA 13:2022Standard for the Installation of Sprinkler SystemsDesign densities, hydraulic calculation method, equivalent lengths

Frequently asked

How do I use the Technical specification maker calculator?

Choose the profile — Government / Private use the house clauses on the Indian codes; International replaces every Indian code with its IEC / ISO / NFPA / EN equivalent — and type the project, employer, consultant, site conditions (ambient, altitude, seismic zone, fire authority, electrical inspectorate) and the building names. Tick the documents or the sections you need: Electrical works (17 sections, HT panel to EV charging), Fire fighting, Fire alarm & PA, HVAC (22 sections incl. lifts), Internal and External plumbing, ITS & ELV, and the special systems; the sections are numbered SECTION I, II … with Scope of work, Codes and standards, the item clauses and Measurement, 'End of Section'. Read the document: every clause can be edited, removed or added; clauses that name the project buildings are marked project-specific — check their wording; codes are listed once per section under Codes and standards and in the schedule at the end. Keep edited clauses as your firm's house version (shared by the company).

Which codes and standards does the technical specification maker follow?

It applies CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation), CPWD General Specifications for Electrical Works Part I (Internal) 2023, NBCS 2026 (SP 7:2026) Part D Sec 2, IS 732:2019, IEC 60364-1, NFPA 13:2022. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/spec/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a technical specification generator?

Yes. People also call it a MEP technical specification template, a electrical specification for tender, a HVAC technical specification. It covers the same calculation under building model design, with the Indian and international code regimes selectable.