All calculators
Building model · Live

Design review — PMC checklist

Review mode for the PMC or the checking engineer: one table with the standard checklist items a submission must answer and, when a project hub is linked, every check the tools already ran — voltage drop and fault levels, lux and emergency lighting, sprinkler coverage and hydraulics, drainage and water risers, ECBC — each with its finding, a status you set and your remark; filter what fails, add items, and issue the review report and Excel with revision and date.

NBCS 2026 (SP 7:2026) Part FNBCS 2026 (SP 7:2026) Part D Sec 2NBCS 2026 (SP 7:2026) Part D Sec 6NBCS 2026 (SP 7:2026) Part E Sec 1NBCS 2026 (SP 7:2026) Part E Sec 2CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation)

What it does

Checks it performs

Sample report

How to use it

  1. Give the review a title, the submission reviewed, the reviewer, revision and date; paste the project hub code to pull the automatic checks from every linked tool.
  2. Go through the sections: each item shows the requirement and reference (and the tool's finding for automatic checks) — set the status and write the remark; add your own items.
  3. Filter on what does not comply or is still to verify; re-run the auto checks after the designer updates the tools.
  4. Issue the review report or the Excel.

What you enter

  • Header — title, submission, reviewer, revision, date, hub code
  • Items — status and remark per item; custom items

What you get

  • Compliance table — requirement, reference, finding, status, remark per section
  • Summary — complies / fails / to verify / open / N/A
  • Report / Excel — the issued review

Also searched as

MEP design review checklist; PMC design review; electrical design review checklist; design compliance review NBC; MEP drawing review checklist; design review report template. The same calculation, the same clauses — one tool for building model design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
NBCS 2026 (SP 7:2026) Part FNational Building Construction Standards — Fire and life safetyMeans of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
NBCS 2026 (SP 7:2026) Part D Sec 6National Building Construction Standards — Information and communication enabled installationsStructured cabling, Wi-Fi (IEEE 802.11ax/be), ICT spaces
NBCS 2026 (SP 7:2026) Part E Sec 1National Building Construction Standards — Water supplyPer-capita demand, storage, fixture units and probable flow, pressures and zoning
NBCS 2026 (SP 7:2026) Part E Sec 2National Building Construction Standards — Drainage and sanitationSanitary fixtures by occupancy (Tables 1–17), DFU, stacks, vents, building drains, rainwater pipes (Table 25)
CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation)CPWD specificationsVoltage-drop cascade limits, cable/wiring practice, panel and metering requirements
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IS 15105:2002Design and installation of fixed automatic sprinkler fire extinguishing systemsSprinkler hazard classes, density / area, K factors, durations
ECBC 2017 (BEE)Energy Conservation Building Code — superseded by ECSBC 2024; still enforced where a State has not yet notified ECSBC 2024Envelope U / SHGC and lighting power density (India option)

Frequently asked

How do I use the Design review — PMC checklist calculator?

Give the review a title, the submission reviewed, the reviewer, revision and date; paste the project hub code to pull the automatic checks from every linked tool. Go through the sections: each item shows the requirement and reference (and the tool's finding for automatic checks) — set the status and write the remark; add your own items. Filter on what does not comply or is still to verify; re-run the auto checks after the designer updates the tools.

Which codes and standards does the design review follow?

It applies NBCS 2026 (SP 7:2026) Part F, NBCS 2026 (SP 7:2026) Part D Sec 2, NBCS 2026 (SP 7:2026) Part D Sec 6, NBCS 2026 (SP 7:2026) Part E Sec 1, NBCS 2026 (SP 7:2026) Part E Sec 2, CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation) and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/review/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a MEP design review checklist?

Yes. People also call it a PMC design review, a electrical design review checklist, a design compliance review NBC. It covers the same calculation under building model design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.

Related building model calculators