Clean, server, DG & TX rooms
Clean-room supply air and HEPA count by ISO class, server-room TR and unit count, DG-room cooling and combustion air with louvre areas, transformer-room losses, ventilation air and louvres.
You enter
- Room dimensions and type
- Loads: IT kW, DG kVA, transformer kVA and losses
- Design conditions
You get
- Air quantities, filter and unit counts
- Louvre areas
- Report
What it does
Checks it performs
Sample report
Inputs, results with basis, checks, worked example, drawing and the standards list. Read it before you pay.
Also searched as
clean room HEPA filter calculation; server room cooling load calculation; DG room ventilation calculation; transformer room ventilation design; ISO 14644 clean room air changes; louver size for DG room. The same calculation, the same clauses — one tool for hvac design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).
Standards applied
| Reference | Title | Used for |
|---|---|---|
| ISO 14644-1/4 | Cleanrooms — classification and design | Air changes, filtration, pressurisation by ISO class |
| NBCS 2026 (SP 7:2026) Part D Sec 3 | National Building Construction Standards — Air conditioning, heating and mechanical ventilation | Design conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation |
| ASHRAE Handbook — Fundamentals 2021 | Psychrometrics (ch. 1), climatic design (ch. 14), cooling/heating load (ch. 18), solar (1997 ch. 29) | Load calculation method, solar heat gain, sol-air temperature |
| IS 10028 (Parts 1–3) | Selection, installation and maintenance of transformers | Transformer room ventilation |
| CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation) | CPWD specifications | Voltage-drop cascade limits, cable/wiring practice, panel and metering requirements |
Frequently asked
How do I use the Clean, server, DG & TX rooms calculator?
Open the tool, change the pre-filled example to your project, read the results, checks and worked steps as you type, then export the report, Excel and DXF.
Which codes and standards does the clean, server, dg & tx rooms follow?
It applies ISO 14644-1/4, NBCS 2026 (SP 7:2026) Part D Sec 3, ASHRAE Handbook — Fundamentals 2021, IS 10028 (Parts 1–3), CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation). Every result line shows the formula and the clause it comes from, and the report lists the standards applied.
What does it check?
Every run is marked PASS or CHECK against: Air changes ≥ ISO class minimum; HEPA face velocity within the filter rating; Louvre face velocity ≤ 2.5 m/s; DG room temperature rise ≤ 10 K; Transformer room rise ≤ the manufacturer limit.
Is the calculator free to use?
Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.
Can I see a sample report before I use it?
Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/rooms/ — inputs, results with basis, checks, worked example, drawing and the standards list.
Is this the same as a clean room HEPA filter calculation?
Yes. People also call it a server room cooling load calculation, a DG room ventilation calculation, a transformer room ventilation design. It covers the same calculation under hvac design, with the Indian and international code regimes selectable.
Does it work with AutoCAD or ZWCAD?
Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.