All calculators
Electrical · Live

Electrical layouts — lighting circuits, DB diagrams, cable tray

Drawings the site engineer needs, straight from the models: every luminaire of the Lighting project on the plan with its DB / circuit tag, circuits packed within the code limits and balanced R-Y-B, loop-in wiring from the room switch and the conduit runs to the DB; a wiring-diagram sheet per DB with incomer, RCCB, MCBs and the circuit table; and the cable-tray plan — draw the routes, place the panels, pull the cables from the PDD schedule, and every segment is sized for the cables it carries.

CPWD General Specifications for Electrical Works Part I (Internal) 2023NBCS 2026 (SP 7:2026) Part D Sec 2IS 732:2019IEC 60364-1IEC 60364-5-52:2009IEC 61537:2006 / IS 17237

What it does

Checks it performs

Sample report

How to use it

  1. Pull the designed luminaires from a Lighting project (rooms keep their plan positions); set the regime and the circuit limits, wire and conduit, emergency-circuit and TPN options.
  2. Place each floor's lighting DB (click the plan, or pick it in the drawing) — circuits are numbered from it and wired loop-in from each room's switch; read the circuit table and the DB summary.
  3. Cable tray: draw the routes (click the plan / drawing), place the panels, pull the cables from a PDD or VD project — every segment gets its tray size and fill.
  4. Export the lighting layout DXF (or draw it straight into the plan), the DB wiring diagrams DXF, the tray plan DXF, the schedules Excel and the report.

What you enter

  • Luminaires — from the Lighting project: positions, watts, emergency flags
  • Basis — regime, W / points per circuit, wire, conduit, emergency circuits, TPN
  • DBs — position per floor
  • Tray — routes, panels, cables (size, runs, OD)

What you get

  • Lighting layout — luminaires with DB / circuit tags, wiring by phase, switches, DB, legend
  • DB diagrams — incomer, RCCB, MCB per circuit, circuit table, spare ways
  • Tray plan — width × depth per segment, fill, supports, cable schedule with lengths
  • Excel / BOQ — circuits, luminaires, DBs, tray segments, cables, quantities

Also searched as

electrical layout drawing automation; lighting circuit layout in AutoCAD; DB wiring diagram generator; cable tray sizing calculator; lighting circuit design CPWD 800 W 10 points; electrical drawing from building plan. The same calculation, the same clauses — one tool for electrical design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
CPWD General Specifications for Electrical Works Part I (Internal) 2023Internal electrical installationsSub-circuit limits (800 W / 10 points), 16 A socket circuits, wiring sizes, DB construction
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IEC 60364-1Low-voltage electrical installations — fundamental principles, assessment of general characteristicsMaximum demand and diversity
IEC 60364-5-52:2009Low-voltage electrical installations — Selection and erection of wiring systemsCurrent-carrying capacity, derating (temperature, grouping, installation method), voltage drop ≤ 3–5 %
IEC 61537:2006 / IS 17237Cable management — cable tray and cable ladder systemsSafe working load, support spacing and deflection of trays and ladders
IS 7098 (Part 1):1988Cross-linked polyethylene insulated PVC sheathed cables up to 1100 VXLPE cable ratings (90 °C), resistance and reactance data
IS 1554 (Part 1):1988PVC insulated (heavy duty) electric cables up to 1100 VCable ratings, resistance and reactance data

Frequently asked

How do I use the Electrical layouts — lighting circuits, DB diagrams, cable tray calculator?

Pull the designed luminaires from a Lighting project (rooms keep their plan positions); set the regime and the circuit limits, wire and conduit, emergency-circuit and TPN options. Place each floor's lighting DB (click the plan, or pick it in the drawing) — circuits are numbered from it and wired loop-in from each room's switch; read the circuit table and the DB summary. Cable tray: draw the routes (click the plan / drawing), place the panels, pull the cables from a PDD or VD project — every segment gets its tray size and fill.

Which codes and standards does the electrical layouts follow?

It applies CPWD General Specifications for Electrical Works Part I (Internal) 2023, NBCS 2026 (SP 7:2026) Part D Sec 2, IS 732:2019, IEC 60364-1, IEC 60364-5-52:2009, IEC 61537:2006 / IS 17237 and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/elec/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a electrical layout drawing automation?

Yes. People also call it a lighting circuit layout in AutoCAD, a DB wiring diagram generator, a cable tray sizing calculator. It covers the same calculation under electrical design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.

Related electrical calculators