All calculators
Electrical · Live

Transformer, DG & UPS sizing

The plant-room numbers from the load estimate: classify each feed, and the tool sizes the transformers for the utility demand with growth and redundancy, the DG sets for the essential load with site derating and a step-by-step loading sequence that checks the transient dip of every motor start (fire pump first), and the UPS with an IEEE 485 battery bank — standard ratings, loading, fault level and fuel burn.

IS 10002:1981ISO 8528-1 / -5IS 1180 (Part 1):2014IEEE Std 485-2020NBCS 2026 (SP 7:2026) Part D Sec 2NBCS 2026 (SP 7:2026) Part F

What it does

Checks it performs

Sample report

How to use it

  1. Pull the feeds from a load-estimation project (or type the loads); set each load's class — essential, non-essential, UPS, fire — and its starting method and motor kW.
  2. Set the basis: growth, diversity per class, transformer units and redundancy, DG sets with site altitude / ambient, allowed transient dip and single-step limit, UPS redundancy and backup time.
  3. Read the selected transformers, DG sets and UPS, the DG loading sequence with the dip at every step, and the checks.
  4. Export the report and the Excel.

What you enter

  • Loads — tag, panel, kind, class, demand kW, starting method, motor kW
  • Basis — growth, diversity, N / N+1, loading limits, derating, dip, UPS battery

What you get

  • Transformers — count × kVA, loading, LV current, fault level
  • DG — count × kVA, derating, loading sequence with transient dip, fuel
  • UPS — modules × kVA, battery strings / blocks / Ah, input kVA, heat

Also searched as

transformer sizing calculator; DG set sizing calculator kVA; diesel generator sizing for building; UPS sizing calculator with battery; transformer kVA calculation for building load; generator starting kVA calculation. The same calculation, the same clauses — one tool for electrical design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
IS 10002:1981Performance requirements for constant speed compression ignition (diesel) engines for general purposesDG set rating, derating for altitude and ambient
ISO 8528-1 / -5Reciprocating internal combustion engine driven alternating current generating sets — ratings, transient performancePrime / standby ratings, load acceptance classes G1–G3, transient voltage dip
IS 1180 (Part 1):2014Outdoor type oil-immersed distribution transformers up to 2500 kVA, 33 kVTypical impedance (%Z) by rating
IEEE Std 485-2020Sizing lead-acid batteries for stationary applicationsBattery capacity, ageing and temperature factors
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
NBCS 2026 (SP 7:2026) Part FNational Building Construction Standards — Fire and life safetyMeans of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation)CPWD specificationsVoltage-drop cascade limits, cable/wiring practice, panel and metering requirements

Frequently asked

How do I use the Transformer, DG & UPS sizing calculator?

Pull the feeds from a load-estimation project (or type the loads); set each load's class — essential, non-essential, UPS, fire — and its starting method and motor kW. Set the basis: growth, diversity per class, transformer units and redundancy, DG sets with site altitude / ambient, allowed transient dip and single-step limit, UPS redundancy and backup time. Read the selected transformers, DG sets and UPS, the DG loading sequence with the dip at every step, and the checks.

Which codes and standards does the transformer, dg & ups sizing follow?

It applies IS 10002:1981, ISO 8528-1 / -5, IS 1180 (Part 1):2014, IEEE Std 485-2020, NBCS 2026 (SP 7:2026) Part D Sec 2, NBCS 2026 (SP 7:2026) Part F and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/source/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a transformer sizing calculator?

Yes. People also call it a DG set sizing calculator kVA, a diesel generator sizing for building, a UPS sizing calculator with battery. It covers the same calculation under electrical design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.

Related electrical calculators