All calculators
Electrical · Live

Power factor correction

kVAR for the target power factor, standard bank sizes and APFC steps, detuned reactors when THD calls for them, capacitor duty, feeder breaker and cable, and the kVA released on the transformer, from a load profile or a transformer section of a voltage-drop project.

IS 13340:1993 / IEC 60831-1IS 13341:1992 / IEC 60831-2NBCS 2026 (SP 7:2026) Part D Sec 2IEC 61921:2017IEEE 519-2022IEC 61000-3-6:2008
What goes in, what comes out

You enter

  • Load kW and existing pf, or a VD transformer section
  • Target pf, harmonic level, step policy

You get

  • kVAR, bank and steps, reactor, capacitor rating
  • Breaker, contactor and cable
  • Report and Excel; kVAR to SLD

What it does

Target pfkVAR = P (tan φ1 − tan φ2) for the connected or diversified load.
APFC stepsStandard bank sizes and step pattern (1:1:1, 1:2:2 …) sized to the load swing.
Detuned reactors7 % or 14 % reactors picked from the harmonic level; capacitor voltage rating uprated.
Capacitor dutyRated kVAR at the actual voltage and with the reactor, per IEC 60831.
FeederBreaker, contactor and cable for the bank current × 1.35 / 1.5.
Push to SLDThe bank appears on the single line diagram and the panel.

Checks it performs

PASS / CHECKCorrected pf ≥ target (default 0.95 / 0.99 as set)
PASS / CHECKStep size ≤ smallest load swing
PASS / CHECKTHD-V within IEEE 519 with the chosen reactor
PASS / CHECKCapacitor voltage rating ≥ bus voltage × reactor factor
PASS / CHECKkVA released ≤ transformer margin

Sample report

How to use it

  1. Enter the load profile (kW / PF) or import from VD.
  2. Set the target PF, harmonic level and step policy.
  3. Read the kVAr, step sizes, detuned reactor selection and bank layout; export.

What you enter

  • Load — kW, present PF, target PF
  • Harmonics — THD, detuning %

What you get

  • kVAr — total and steps
  • Bank — capacitor / reactor / contactor schedule

Also searched as

power factor correction calculator; kVAR calculation for power factor improvement; APFC panel sizing; capacitor bank calculation kVAR; detuned reactor sizing; power factor improvement calculation online. The same calculation, the same clauses — one tool for electrical design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
IS 13340:1993 / IEC 60831-1Shunt capacitors of the self-healing type for a.c. systems up to 1000 VCapacitor rating, 1.3 × In continuous overcurrent, feeder ≥ 1.5 × In
IS 13341:1992 / IEC 60831-2Shunt capacitors — Ageing test, self-healing test and destruction testCapacitor duty
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
IEC 61921:2017Power capacitors — Low-voltage power factor correction banksAPFC bank design, step switching, detuned reactors, discharge ≤ 50 V in 1 min
IEEE 519-2022Harmonic control in electric power systemsTHD limits at PCC (voltage 5–8 %, current 5–20 % by Isc/IL); active filter target THD-I
IEC 61000-3-6:2008EMC — Assessment of emission limits for distorting loads (MV/HV)Harmonic emission assessment
IEC 60364-5-52:2009Low-voltage electrical installations — Selection and erection of wiring systemsCurrent-carrying capacity, derating (temperature, grouping, installation method), voltage drop ≤ 3–5 %

Frequently asked

How do I use the Power factor correction calculator?

Enter the load profile (kW / PF) or import from VD. Set the target PF, harmonic level and step policy. Read the kVAr, step sizes, detuned reactor selection and bank layout; export.

Which codes and standards does the power factor correction follow?

It applies IS 13340:1993 / IEC 60831-1, IS 13341:1992 / IEC 60831-2, NBCS 2026 (SP 7:2026) Part D Sec 2, IEC 61921:2017, IEEE 519-2022, IEC 61000-3-6:2008 and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

What does it check?

Every run is marked PASS or CHECK against: Corrected pf ≥ target (default 0.95 / 0.99 as set); Step size ≤ smallest load swing; THD-V within IEEE 519 with the chosen reactor; Capacitor voltage rating ≥ bus voltage × reactor factor; kVA released ≤ transformer margin.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/pf/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a power factor correction calculator?

Yes. People also call it a kVAR calculation for power factor improvement, a APFC panel sizing, a capacitor bank calculation kVAR. It covers the same calculation under electrical design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.

Related electrical calculators