All calculators
Electrical · Live

Lift traffic analysis (up-peak)

Up-peak lift traffic by the CIBSE Guide D classical method: probable stops, highest reversal floor, round trip time, interval and 5-minute handling capacity. Picks the number of lifts, rated load and speed for the building type, suggests low / high zones for tall buildings and gives the motor kW and group load for the SLD.

CIBSE Guide D:2020ISO 8100-32EN 81-20:2020IS 14665 (parts 1–5)NBCS 2026 (SP 7:2026) Part D Sec 5
What goes in, what comes out

You enter

  • Building type, floors, interfloor height
  • Area and density or persons per floor
  • Lift data (or select), door times

You get

  • Lifts × load × speed, RTT, interval, %POP
  • Zoning suggestion
  • Lift load for the SLD; report

What it does

SelectionLifts, rated load and speed that meet the interval and handling capacity.
ZoningLow / mid / high zones with the express run when one group is not enough.
Electrical loadMotor kW per lift, group load with diversity, feeder current.

Checks it performs

PASS / CHECKInterval within the target
PASS / CHECK5-minute handling capacity ≥ the target
PASS / CHECKZoned arrangement meets both targets

Sample report

Also searched as

lift traffic analysis calculator; number of lifts calculation; lift round trip time interval handling capacity; elevator traffic calculation CIBSE Guide D. The same calculation, the same clauses — one tool for electrical design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
CIBSE Guide D:2020Transportation systems in buildingsLift traffic design
ISO 8100-32Lifts — planning and selection of passenger lifts in office, hotel and residential buildingsTraffic analysis
EN 81-20:2020Safety rules for the construction and installation of lifts — passenger and goods passenger liftsLift safety rules
IS 14665 (parts 1–5)Electric traction lifts — guidelines, code of practice, safety rules, components, inspection and maintenanceLift dimensions, safety and testing (India)
NBCS 2026 (SP 7:2026) Part D Sec 5National Building Construction Standards — Lifts, escalators, moving walks and power-driven parkingLift traffic, fire-fighting lifts, controls

Frequently asked

How do I use the Lift traffic analysis (up-peak) calculator?

Open the tool, change the pre-filled example to your project, read the results, checks and worked steps as you type, then export the report, Excel and DXF.

Which codes and standards does the lift traffic analysis (up-peak) follow?

It applies CIBSE Guide D:2020, ISO 8100-32, EN 81-20:2020, IS 14665 (parts 1–5), NBCS 2026 (SP 7:2026) Part D Sec 5. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

What does it check?

Every run is marked PASS or CHECK against: Interval within the target; 5-minute handling capacity ≥ the target; Zoned arrangement meets both targets.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/lifttraffic/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a lift traffic analysis calculator?

Yes. People also call it a number of lifts calculation, a lift round trip time interval handling capacity, a elevator traffic calculation CIBSE Guide D. It covers the same calculation under electrical design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.

Related electrical calculators