UPS & battery sizing
UPS module rating and count for N, N+1 or 2N, battery Ah by the constant-power method with ageing and temperature factors, blocks × strings, charger and input current, heat to the room and hydrogen ventilation.
You enter
- Load kW / kVA, growth, redundancy
- Autonomy, battery type, temperature
- Room size, mounting
You get
- Modules, battery blocks × strings, Ah
- Charger, input current, breaker, cable
- Heat and ventilation; report
What it does
Checks it performs
Sample report
Inputs, results with basis, checks, worked example, drawing and the standards list. Read it before you pay.
Also searched as
UPS sizing calculator; UPS battery sizing calculator Ah; UPS backup time calculation; battery bank sizing IEEE 485; UPS room cooling and hydrogen venting; N+1 UPS configuration sizing. The same calculation, the same clauses — one tool for electrical design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).
Standards applied
| Reference | Title | Used for |
|---|---|---|
| NBCS 2026 (SP 7:2026) Part D Sec 2 | National Building Construction Standards — Electrical and allied installations | Load assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads |
| IEEE Std 485-2020 | Sizing lead-acid batteries for stationary applications | Battery capacity, ageing and temperature factors |
| IEC 62040-3 | UPS — performance and test requirements | UPS classification and rating |
| IS 16242 / IEC 62040 | Uninterruptible power systems | UPS requirements (India) |
| IEEE Std 1184 | Guide for batteries for UPS | Battery selection for UPS |
Frequently asked
How do I use the UPS & battery sizing calculator?
Open the tool, change the pre-filled example to your project, read the results, checks and worked steps as you type, then export the report, Excel and DXF.
Which codes and standards does the ups & battery sizing follow?
It applies NBCS 2026 (SP 7:2026) Part D Sec 2, IEEE Std 485-2020, IEC 62040-3, IS 16242 / IEC 62040, IEEE Std 1184. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.
What does it check?
Every run is marked PASS or CHECK against: Module capacity ≥ load kW with growth; Autonomy ≥ required minutes at end-of-life; Battery voltage window within the UPS DC limits; Input breaker ≥ rectifier current with recharge; Ventilation ≥ hydrogen dilution requirement.
Is the calculator free to use?
Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.
Can I see a sample report before I use it?
Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/ups/ — inputs, results with basis, checks, worked example, drawing and the standards list.
Is this the same as a UPS sizing calculator?
Yes. People also call it a UPS battery sizing calculator Ah, a UPS backup time calculation, a battery bank sizing IEEE 485. It covers the same calculation under electrical design, with the Indian and international code regimes selectable.
Does it work with AutoCAD or ZWCAD?
Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.